Coil winding machine, also known as foil winding machine, is a special equipment for winding transformer foil coils, coil winding machine using reactor full-active cold press welding foil winding machine PLC active control frequency stepless speed control system, photoelectric hydraulic deskewing system, active welding organization and other active control functions. Ensure the welding quality of the transformer winding foil, so that the transformer loss decreased significantly, and its functional parameters have reached the leading level of the domestic industry. The equipment discharge head selection of hydraulic expansion and contraction organization operation is convenient, labor-saving. Foil tightening selection of independent two-stage control precision and convenience, positive winding, suspension, winding can adhere to the required tension, to ensure that the coil is tight. Interlayer paper tightening using gas expansion shaft, magnetic powder clutch and other advanced equipment, material change, tension adjustment is convenient and fast. Active welding organization, speed active adjustment, to ensure the efficiency and reliability of the equipment. Correct operation of the coil winding machine, must be strictly in accordance with the coil winding machine safety skills operating procedures to operate, as follows:
First: the operator must be trained to master the structure and function of the coil winding machine and understand the operating procedures before independent operation.
Second: Before operation, wear good rules of labor protection, from time to time to have a “safety first” ideological awareness.
Third: the risk part of the coil winding machine should be set up significant warning or stop signs, in addition to coil winding machine equipment special operators, other personnel shall not approach.
Fourth: before starting the machine should check whether the equipment is defective, reliable. Such as manipulator, protection equipment, brakes and other primary accessories, if the failure, prohibit boot operation, and promptly notify the professional overhaul.
Five: no-load test drive, check the equipment of the various operating systems and equipment, foot switch is active, reliable, recognized as normal before coil winding production.
Six: the operation process, in strict accordance with the instructions for the use of equipment to concentrate, focus on the operation, to avoid operational errors.
Seven: more than two people to operate, to cooperate with each other, coordinated, something to entertain each other, and prohibited from doing their own thing.
Eight: the equipment presents a problem should immediately suspend the operation, close the power supply, and state the workshop leadership and specialized repair personnel overhaul; overhaul by the recognition of qualified before the operation from the beginning.
Nine: the winding coil should be carefully placed according to the rules of the local; off duty should be timely to do a good job of equipment cleaning and maintenance work.
Ten: the use of argon-fluorine welder, grounding wire is necessary to connect securely, before welding it is necessary to check whether the cooling water is normal operation, welding wear the necessary protective equipment (gloves, masks, protective goggles, etc.).
XI: oxygen welding abide by the “gas welding and cutting safety code of practice”.
WhatsApp/Wechat: +86 13075286997
E-post: sales@vacuz.com