With the rapid development of the economy, the demand for small transformers is increasing, which also increases the demand for automatic transformer coil winding machine, the requirements are becoming more and more stringent, the operation steps are relatively complex, but as long as the automatic transformer coil winding machine, the basic general steps are similar.
1. Check before starting, power on, check the winding machine before starting to ensure that no major problems are found, and do a good job on the 5s.
2. Power on and warm up the machine, after turning on the machine, you need to do the warm-up operation, but the winding machine into the normal state of power and ventilation, the normal operation of all parts before doing the next step.
3. Set the parameters, find out the corresponding material specifications and models, and set the corresponding parameters in the winding machine according to the recent requirements to be processed.
4. Debugging. After the parameters are set, it does not mean that you can produce directly. Commissioning is required to ensure that all parameters and components operate in harmony and that the quality of the product produced meets the standards.