What details should be paid attention to before and after the assembly of motor production line equipment

Motor production line is a highly automated production and assembly line, in order to ensure production efficiency and product quality, whether before production, or after production, you need to pay attention to check each component each station to ensure that the production line is running properly. The following points are often noted.

BLDC 线圈绕组
BLDC 线圈绕组

1.Operation data, there are general assembly drawings, parts assembly drawings, parts drawings, material BOM list, etc., must ensure the integrity of the drawings, neatness.

2. Workplace, the placement and assembly of parts must be carried out in the designated workplace, and the workplace must be kept neat, standardized and orderly.

3. Assembly materials, the specified assembly materials must be in place on time during the assembly process.

4. Pre-assembly equipment structure, assembly technology and process requirements. When the assembly work is completed, check the assembly drawing and check whether the parts are missing; check whether the connection between the assembled parts is normal; when testing the motor assembly line, please monitor the starting process carefully; pay attention to test the movement speed, movement stability, rotation of each drive shaft, temperature, vibration and noise, etc.

线圈绕线机
线圈绕线机

These are the details that should be paid attention to before and after the assembly of the motor production line. Only by fully grasping these basics can we ensure the normal assembly and stable operation of the motor production line.

WhatsApp/Wechat:+86 13075286997

电子邮件: sales@vacuz.com [fusion_form form_post_id=”431″ margin_top=”” margin_right=”” margin_bottom=”” margin_left=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=””][/fusion_form].

电子邮件:sales@vacuz.com
立即查询 Vacuz

留下评论

您的邮箱地址不会被公开。 必填项已用 * 标注